понедельник, 28 марта 2011 г.

SyncBack V3 (freeware) :: RE: No longer working...

Author: Dave Wilkins
Subject: Re: No longer working...
Posted: Mon Mar 28, 2011 5:29 pm (GMT 0)

I knew something was bothering me about this...
taekwondodo wrote:
....Went into SB and checked and under the "main screen" (the one that comes up when you start SB) shows under "result" = "Failure", but shows the last successful date it ran, and the next scheduled date it will run (but not the date that failed)

You would have had extreme difficulty in checking the Last Successful Run, because there's no such column (value) in the freeware. All it shows is Last Run... whether that Last Run was a Success or not will be in the Result column. And yours showed Failure (which was presumably some failure or other in November? I guess checking the log would have revealed that...)

The commercial versions have both Last Run and Last Successful Run (which might hold different values) - but the freeware does not. Ipso facto, it was displaying the last date it ran - meaning the problem was that the Windows Scheduler wasn't running the profile at all Idea

Good luck with your tests...
_________________
Follow us on Twitter: http://twitter.com/2brightsparks/

Have you taken the profiles backup survey?

software engineering software for students

Комментариев нет:

Отправить комментарий